L2024-4-23b
JH
8431499000
Color: | Please select |
---|---|
Availability: | |
Quantity: | |
Quality Control | 1.Raw Materials Test, include chemical composition and size; | |
2.Random inspection during production; | ||
3.Final products size test, with measurement tools, special gauges and Coordinate instrument if needed; | ||
4.Final products Strenght and Hardness test, to guarantee the mechanical property; | ||
5.Assembly and Function test, with special testing gauges; | ||
6.Packing test | ||
Packing | Plastic bags, Cartons, Racks, Plywood Cases etc. | |
Logistics | Shipping, Air Flight, International Express etc. | |
Process | Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc. | |
Certificate | ISO/9001 ISO/IATF16949 | |
Service | Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc. |
1.Which countries do you export to?
U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand,
2.How long does it take to receive samples?
A) Pattern:30-45days after order
B) Sample:30days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.
3.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.
4.How long is the manufacturing lead time?
Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.
5 Hao to deal with the quality problem?
A.We perform APQP at an early stage in each project.
B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.
D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.
Quality Control | 1.Raw Materials Test, include chemical composition and size; | |
2.Random inspection during production; | ||
3.Final products size test, with measurement tools, special gauges and Coordinate instrument if needed; | ||
4.Final products Strenght and Hardness test, to guarantee the mechanical property; | ||
5.Assembly and Function test, with special testing gauges; | ||
6.Packing test | ||
Packing | Plastic bags, Cartons, Racks, Plywood Cases etc. | |
Logistics | Shipping, Air Flight, International Express etc. | |
Process | Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc. | |
Certificate | ISO/9001 ISO/IATF16949 | |
Service | Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc. |
1.Which countries do you export to?
U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand,
2.How long does it take to receive samples?
A) Pattern:30-45days after order
B) Sample:30days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.
3.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.
4.How long is the manufacturing lead time?
Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.
5 Hao to deal with the quality problem?
A.We perform APQP at an early stage in each project.
B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.
D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.