EMAIL US

CALL US

+86-185 3798 8153
+86-185 3888 7479
You are here: Home » Products » Industries » Other Mechanical Parts » Towing Hook » Slide Piece U-Shaped Clips or Hooks

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Slide Piece U-Shaped Clips or Hooks

Slide Piece U-Shaped Clips or Hooks are typically manufactured through a stamping and forming process using materials like stainless steel or aluminum, followed by bending to achieve the U-shape, with heat treatment and surface coating applied for added strength and corrosion resistance.
  • SP001

  • Henan Forging Emperor

Availability:
Quantity:

Slide Piece U-Shaped Clips or Hooks are typically manufactured through a stamping and forming process using materials like stainless steel or aluminum, followed by bending to achieve the U-shape, with heat treatment and surface coating applied for added strength and corrosion resistance.

Product Descript

ProcessHot forging, Die forging and Free forging
MaterialCarbon steel: 1020,1020,1035,1045,1055,Q235,Q345 etc.,
Alloy steel: 40Cr, 20CrMnTi, 20CrNiMo,35CrMn,42CrMo4 etc.,
Stainless steel, SS304,SS316 etc.
StandardISO, DIN, ASTM, BS ect.
Weight0.1kg - 120kg
Applicable Machining ProcessCNC Machining/ Lathing/ Milling/ Turning/ Boring/ Drilling/ Tapping/ Broaching/Reaming etc.
Machining Tolerance0.02mm-0.1mm
Machined Surface QualityRa 0.8-Ra3.2 according to customer requirement
Applicable Heat TreatmentNormalization , quenching and tempering, Case
Hardening, Nitriding, Carbon Nitriding,
Applicable Finish Surface TreatmentShot/sand blast, polishing, Surface passivation, Powder coating, E- Coating, Chromate Plating, zinc-plate, Dacromat, Painting,
Testing equipmentSupersonic inspection machine, Supersonic flaw detecting machine , physics and chemical analysis.
PackingWooden cases or according to customers' needs
MOQ of mass production1000-5000pcs

FAQ

1.Which countries do you export to?

U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand,

2.How long does it take to receive samples?

A) Pattern:30-45days after order

B) Sample:30days after pattern finishing.

C) The lead time is the general production period and does not include the transportation time.

3.New product development process

Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.

4.How long is the manufacturing lead time?

Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.

We could make some special production arrangement effectively if customer has urgent need.

5 How to deal with the quality problem?

A.We perform APQP at an early stage in each project.

B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.

C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.

D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.

6.Can you take responsibility for me?

Of course, I'm happy to help you!But I just take responsibility for my products.Please offer a test report, if it was our fault, absolutely we can make a compensation for you, my friend!

7.What are the payment terms?

Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 50% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

8.Which currency can we buy in?

We can deal in USD / Euro currency / RMB

9.How long does it take to ship goods from China by sea?

It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Qingdao Port.

10.How long does it take to ship goods from China by air?

It takes about 7 days to all major destinations.

11.Can we visit the factory to conduct an audit?

Yes, you are welcome to visit our factory.

12.How do we retain client confidentiality?

We are happy to sign Confidentiality Agreements with customers and will honor them.

13.Is there a minimum volume of business required to conduct international purchasing?

There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it more economical to buy in high volumes.All potential customers will be assessed on an individual basis to determine if it appears a viable option for all parties to develop a relationship.


Previous: 
Next: 
  • Luolong Industrial District, Luoyang City, Henan Province, China, 471000
  • E-mail us:
    andy@gold-forging.com
  • Call us on:
    +86-185 3888 7499
    +86-185 3798 9397
    +86-185 3883 0700