EMAIL US

CALL US

+86-185 3798 8153
+86-185 3888 7479
You are here: Home » News » Hot Test! Open Up The Process Chain of Extra-thick Plate Products

Hot Test! Open Up The Process Chain of Extra-thick Plate Products

Views: 0     Author: Site Editor     Publish Time: 2025-03-21      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

At 18:00 on March 15, China Baowu Zhanjiang Steel Plate Factory 2025 annual repair heat test achieved a complete success. This 30-day annual repair and transformation not only opened up the process channel of extra-thick plate products, but also laid a solid foundation for subsequent production through systematic equipment upgrading. This annual renovation covers the upgrading of equipment such as secondary tangential and heating furnace area roller table, transmission motor, slab transversal device, as well as high-pressure water phosphorus removal device and the transformation of roughing mill roller table.

微信图片_20250321143845

Since the operation in 2016, the project team has adhered to the principle of "centralized planning and step-by-step implementation", and completed the localization upgrade of the full-line variable frequency transmission system for ten years under the premise of ensuring the stable operation of the production line. The transformation makes full use of the original equipment frame, and effectively controls the investment cost by optimizing the design scheme.


  • Luolong Industrial District, Luoyang City, Henan Province, China, 471000
  • E-mail us:
    andy@gold-forging.com
  • Call us on:
    +86-185 3888 7499
    +86-185 3798 9397
    +86-185 3883 0700